TI Distributor
TI(Texas Instruments) Distributor & Supplier
Broadest Portfolio of TI Products in Stock
OPA4990SIRTER TI QUAD 1-MHZ, 40-V RAIL-TO-RAIL IN
OPA4990SIRTER Images
OPA4990SIRTER Images
  • Manufacturer: Texas Instruments (TI)
  • Category: Integrated Circuits (ICs)~Linear - Amplifiers - Instrumentation, OP Amps, Buffer Amps Package/Case: 16-WFQFN Exposed Pad
  • Description: QUAD 1-MHZ, 40-V RAIL-TO-RAIL IN
  • COMPETITIVE PRICE and DELIVERY TIME
  • Order with confidence, there are no lead times for in-stock products.
Quickly Quote for You to Meet Your Target Price, Support Small Order Quantity with Fast Quick Delivery.
Download Datasheet (PDF)
OPA4990SIRTER Datasheet
ELECTRONIC COMPONENTS, CHOOSE NHE ELECTRONICS
OPA4990SIRTER Specifications:
  • MfrPart.: OPA4990SIRTER
  • Mfr: Texas Instruments
  • Description: QUAD 1-MHZ, 40-V RAIL-TO-RAIL IN
  • Product Category: Integrated Circuits (ICs)~Linear - Amplifiers - Instrumentation, OP Amps, Buffer Amps
  • Package: Tape & Reel (TR),Cut Tape (CT)
  • Series: -
  • PartStatus: Active
  • AmplifierType: General Purpose
  • NumberofCircuits: 4
  • OutputType: Rail-to-Rail
  • SlewRate: 4.5V/µs
  • GainBandwidthProduct: 1.1 MHz
  • -3dbBandwidth: -
  • Current-InputBias: 10 pA
  • Voltage-InputOffset: 300 µV
  • Current-Supply: 120µA (x2 Channels)
  • Current-Output/Channel: 80 mA
  • Voltage-SupplySingle/Dual(±): 2.7V ~ 40V, ±1.35V ~ 20V
  • OperatingTemperature: -40°C ~ 125°C (TA)
  • MountingType: Surface Mount
  • Package/Case: 16-WFQFN Exposed Pad
  • OPA4990SIRTER TI, QUAD 1-MHZ, 40-V RAIL-TO-RAIL IN, Integrated Circuits (ICs)~Linear - Amplifiers - Instrumentation, OP Amps, Buffer Amps
OPA4990SIRTER, TI authentic parts in stock from TI authorized distributors, order today, can ship immediately.
Texas Instruments (TI) Distributor & TI Electronic Components Supplier in China - NHE
TI Authorized Distributor | NHE is dedicated to providing first-quality, genuine Texas Instruments (TI) components.